DIAGEO USVI

Barrel Filling Building

Services Provided:

Design/Build

Project Completed:

December 2010

Approximate Cost:

$1,250,000

Architect:

Benton Design Team

J. Benton Construction was selected as the Design/Builder for this project to develop an efficient and cost effective manufacturing space to house our client’s specialized barrel filling and washing equipment.  We worked closely with the equipment supplier and DIAGEO’s operations team to ensure the best use of the space possible.