Projects» Civil

Projects» Utility

Seven Seas Water

Reverse Osmosis Plant

Services Provided:

General Contractor

Project Completed:

January 2013

Approximate Cost:

Undisclosed

Architect:

Paul Ferreras, PE

J. Benton Construction was selected as the civil contractor by Seven Seas Water for this 3.3 MGD salt water reverse osmosis (SWRO) plant at the Randolph E. Harley Power Plant in St. Thomas.  Our scope of work included site grading, preparation of the building pad using screened in-situ material as well as imported structural fill, rock removal, in-slab electrical rough-in, grounding installation, plumbing rough-in, site drainage and utilities.  Site improvements included a retaining wall, concrete curbs, transformer pad and gravel driveway and parking.

MENU